How a Wholesale Offer Is Underwritten, Step by Step
WholeSellTX treats a wholesale deal as a sequence of estimates, each with its own error bars. This page lays out that sequence in order, from comparable sales to the maximum allowable offer (MAO), and shows where each input comes from. It is general education about the maths, not investment, legal or tax advice. For licensing and legal questions, the Texas Real Estate Commission (TREC) is the authority.
Step 1: After-repair value from comparable sales
The after-repair value (ARV) is an estimate of what the house would sell for once repaired. It comes from recent sales of similar homes nearby: similar size, age, bedroom count and condition after repair. The weakest part of most deals is a careless ARV, because every later number depends on it. Write down which comps you used and why, and treat the result as a range rather than a single figure.
Step 2: Repair estimate
List repairs room by room and system by system: roof, foundation, HVAC, plumbing, electrical, kitchens, baths, flooring and paint. Price each item from contractor bids or your own records rather than rules of thumb, and add a contingency line for what you cannot see. Foundation work is common in parts of Texas with expansive clay soils, so it deserves its own line.
Step 3: Holding and closing costs
A buyer who repairs and resells pays costs while they hold the house and again at each closing:
- property taxes and insurance for the holding period (Texas has no state income tax, but property taxes are relatively high);
- utilities, loan interest and fees if the purchase is financed;
- title insurance, whose premium rates in Texas are set by the Texas Department of Insurance;
- agent commissions and other selling costs on the resale.
Step 4: Maximum allowable offer
One common way to write the formula is:
MAO = (ARV × factor) − repairs − holding and closing costs − assignment fee
The "70% rule" uses a factor of 0.70. It is a heuristic for leaving room for error and profit, not a law or a standard. A sceptical underwriter changes the factor to fit the risk of the deal, rather than treating 70% as fixed.
A hypothetical worked example
| Input | Hypothetical value |
|---|---|
| ARV | $250,000 |
| Factor | 0.70 |
| Repairs | $40,000 |
| Holding and closing costs | $20,000 |
| Assignment fee | $10,000 |
| MAO | $105,000 |
Here 250,000 × 0.70 = 175,000, and 175,000 − 40,000 − 20,000 − 10,000 = 105,000. Every number is invented to show the arithmetic. None of them is market data.
Sanity checks before any offer
Re-run the calculation with a lower ARV and higher repairs to see how much room is left. If a small change in one input wipes out the margin, the deal is fragile. The tools page and the glossary explain each input in more detail.